• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jan 2024 - Apr 2024
  • Estimated project cost $1,247,499
  • Australian Government contribution $1,247,499
  • Local Council/Shire Wyndham City Council
  • State VIC

Project description

Road pavement has deteriorated with cracking and shape loss, kerb and channel is deteriorated and holding water in multiple locations

Existing pavement will be rehabilitated by removing existing pavement to the bottom of kerb and replaced with deep strength asphalt. All conrete kerbing will be removed and replace with new kerb and channel to redesigned levels to remove ponding locations. Minor repairs to drainage system using non-destructive patching works.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.