• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Apr 2024 - May 2024
  • Estimated project cost $177,981
  • Australian Government contribution $177,981
  • State NSW

Project description

The existing surface is affected by surface layer delamination, potholes and pavement failures within traffic lanes as well as road restoration associated with repairs of underground services. The surface roughness is high due to combined impact of various surface defects pavement defects.

The proposed treatment includes strengthening of traffic lanes by replacement of existing road base with asphalt and full resurfacing of the road. Length = 170 m; Width = 10 m; Area = 1700 m2

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.