• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Apr 2024 - Jun 2024
  • Estimated project cost $180,755
  • Australian Government contribution $180,755
  • State NSW

Project description

The existing road surface is affected by numerous cracks and deformation of road surface. The surface is old and brittle, which makes it prone to development of new cracks and potholes. It has poor ride quality.

The proposed treatment will include reconstruction of trafficable areas with asphalt and full resurfacing of the road with asphalt. Length = 210 m; Width = 10.2 m; Area = 2142 m2

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.