• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2024 - Jun 2024
  • Estimated project cost $162,511
  • Australian Government contribution $162,511
  • State NSW

Project description

The existing road surface is affected by pavement failures and deformations caused by bus and heavy vehicle traffic. The existing pavement is weak for the current traffic loads.

The proposed treatment includes strengthening of existing pavement by replacement with asphalt and resurfacing of the road with asphalt. Length = 96 m; Width = 11.8 m; Area = 1132.8 m2.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.