• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Apr 2024 - May 2024
  • Estimated project cost $96,784
  • Australian Government contribution $96,784
  • State NSW

Project description

The existing road surface is affected by structural cracks, deformations and pavement failures. It has low texture due to excess of bitumen on the surface.

The proposed treatment will include repair of failed pavement areas by heavy patching with asphalt and resurfacing of the road with asphalt. Length = 158 m; Width = 10.2 m; Area = 1611.6 m2

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.