• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Feb 2024 - Jun 2024
  • Estimated project cost $492,650
  • Australian Government contribution $492,650
  • Local Council/Shire Hume City Council
  • State VIC

Project description

the works will address OH&S for road users/residents. The existing road is in poor condition and requires to be reconstructed.

To reconstruct Cobram St, Broadmeadows between Pascoe Vale Service Road and Nathalia St. Construct pavement with minimum 30-year design life. Provide suitable roadside drainage as per EDCM 2019 13.18: max 90m spacing, at kerb return tangents and at low points. House discharge points to be connected to new drainage infrastructure. Ensure Kerb ties into existing tangents at suitable levels and grades

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.