• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2024 - May 2024
  • Estimated project cost $108,163
  • Australian Government contribution $108,163
  • Local Council/Shire Shire of Quairading
  • State WA

Project description

Changing water flow patterns means that two existing 300mm culvert pipes are no longer sufficient to take volumes of water being experienced during rainfall events. Significant damage is also caused with water pooling in a paddock near the road to west of site.

Improved drainage by replacing the pipes with culvert boxes as well as addressing the pooling water with a raised and sealed floodway.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.