• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Nov 2023 - Mar 2024
  • Estimated project cost $319,473
  • Australian Government contribution $319,473
  • Local Council/Shire Shire of Upper Gascoyne
  • State WA

Project description

1. Reseals: Routine resealing work on the Shire's sealed road network to achieve its road asset preservation requirements. 2. Floodway Reconstruction: reconstruction of 2x floodways that had failed as result of environmental factors and conditions (pavement worn off from traffic and flooding).

Reseal Various Sections of Road and Reconstruct Two Sealed, Cement Stabilised Floodways. Reseal 7mm Aggregate Slk 56.26 - 56.40 (1m wide) LHS Slk 56.53 - 56.77 (1m wide) LHS Slk 56.98 - 57.00 (1m wide) RHS Reseal 14mm Aggregate Slk 70.05 - 70.26 (9m wide) full width Slk 72.16 - 72.80 (9m wide) full width Slk 73.44 - 74.92 (8m wide) full width Reconstruct Sealed, Cement Stabilised Floodway Slk 63.43 - 63.49 (10m wide) Slk 65.00 - 65.06 (10m wide)

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.