• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish May 2024 - Jun 2024
  • Estimated project cost $2,880,000
  • Australian Government contribution $328,500
  • State NSW

Project description

The existing culverts does not have the required capacity to discharge water during rain events and is being frequently flooded and sedimented reducing flows during subsequent rainfall events. The existing culverts are also in deteriorated condition requiring it to be replaced to ensure the road remains open.

Replacement of affected existing culverts with Concrete precast Box Culverts, that includes removal of existing culverts, installation of new foundations, slab wings and head walls as well as reconstruction of approaches along with improvement of scour protection. This would also involve possible closing the road during construction, putting in a bypass or finding a detour around the construction site during construction phase.

Total cost of proposed project is $2,880,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.