• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Apr 2024 - Jun 2024
  • Estimated project cost $105,031
  • Australian Government contribution $105,031
  • Local Council/Shire Sutherland Shire Council
  • State NSW

Project description

The section of road is deteriorated due to road surface and part base course failure. Road is significantly potholed and surface cracked. Requires part renewal of the base course and resurfacing.

Full width road pavement rehabilitation works for a length of 260m (entire section). Works includes 70mm depth of asphalt concrete (AC20) base course and 50mm asphalt concrete (AC14) wearing course.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.