• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2024 - Dec 2024
  • Estimated project cost $525,078
  • Australian Government contribution $525,057
  • Local Council/Shire Mid Murray Council
  • State SA

Project description

Road is in a very poor condition with cracking and potholing evident.

Apply a new coat of bitumen and stone/aggregate over the existing bitumen surface areas being two road along East Front Road sections: (3.7 km Length x 6.2 m Wide) and (6.4 km Length x 7.2 m Wide). This work practice will extend the life of the asset by approximately 13 years.

Total cost of proposed project is $525,078

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.