• Funding program Roads to Recovery Program
  • Status Underway
  • Transport mode Road
  • Expected start/finish Nov 2025 - Mar 2026
  • Estimated project cost $120,000
  • Australian Government contribution $120,000
  • State NSW

Project description

The existing road surface is affected by various pavement defects, cracks and failures. It is old and prone to development of potholes and cracks. The proposed work includes repair of failed pavement areas by patching and road resurfacing with hot mix asphalt. Length = 320 m; Width = 9 m; Area = 2880 m2

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.