• Funding program Roads to Recovery Program
  • Status In planning
  • Transport mode Road
  • Expected start/finish Jan 2026 - Mar 2026
  • Estimated project cost $257,604
  • Australian Government contribution $257,604
  • State NSW

Project description

The existing pavement has been affected by numerous cracks and pavement failures due to traffic of large number of heavy vehicles. It has been patched numerous times in the past; which makes it rough.

The proposed treatment includes reconstruction of trafficable areas with asphalt and resurfacing with hot mix asphalt. Length = 318 m; Average Width = 10.2 m; Area = 3260 m2.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.