• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Apr 2025 - Jun 2025
  • Estimated project cost $406,826
  • Australian Government contribution $233,000
  • Local Council/Shire Greater Shepparton City Council
  • State VIC

Project description

Renewing a defective drainage system in kerb and channel, and connection of drainage outlet into table drain.

773 lineal metres of kerb and channel, including 132 metres of kerb to allow link to drainage network. 2 new pram crossings providing access to walking tracks. Install 7 new stormwater pits and modify 3 existing stormwater pits to design levels interacting with kerb and channel. Install 18 m of 375 mm diameter concrete stormwater pipe and headwall with beaching to outlet in table drain. Supply and install 430 m2 of asphalt.

Total cost of proposed project is $406,826

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.