• Funding program Roads to Recovery Program
  • Status In planning
  • Transport mode Road
  • Expected start/finish Oct 2025 - Dec 2025
  • Estimated project cost $125,000
  • Australian Government contribution $125,000
  • Local Council/Shire Shire of Capel
  • State WA

Project description

Gravel road - widening from 5.8 m to 9.6 m, flattening of the bend at SLK 12.42, Improve drainage batters/swales and install W-beams on bends to improve safety. The road is quite narrow in places with sharp bends resulting in vehicle conflicts.

It is proposed to gravel resheet the road, widen from 6 m to 8 m, construct swale drains along alignment, install culverts at SLK 12.4, install W beams from SLK 12.35 to 12.45.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.