• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Apr 2025 - Jun 2025
  • Estimated project cost $65,572
  • Australian Government contribution $65,572
  • Local Council/Shire Shire of Manjimup
  • State WA

Project description

The existing road surface is old, very uneven and cracking exists in a number of locations. A section of kerbing is in a poor state of repair and requires replacement.

Remove the failed kerbing, place asphalt corrector in sections of the road to form an evenly graded running surface then place a 25 mm asphalt overlay; replace the removed kerbing.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.