• Funding program Roads to Recovery Program
  • Status Not started
  • Transport mode Road
  • Expected start/finish Jan 2026 - Mar 2026
  • Estimated project cost $324,550
  • Australian Government contribution $324,550
  • Local Council/Shire Fairfield City Council
  • State NSW

Project description

The road is affected by some failures of road base, depressions and various types of cracks. The proposed treatment includes providing sub soil drainage system, upgrade of existing pedestrian crossing the rectification of failed areas and resurface with rubberised seal and hot mix asphalt. Length = 314 m Width = 11.5 m Area = 2970 m2.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.