• Funding program Roads to Recovery Program
  • Status Under construction
  • Transport mode Road
  • Expected start/finish Jul 2025 - Jun 2026
  • Estimated project cost $178,043
  • Australian Government contribution $178,043
  • Local Council/Shire Shire of Cranbrook
  • State WA

Project description

The deterioration of the existing gravel surface due to loss of surface material over time, as well as improving drainage and enhancing rideability and vehicle safety, particularly for the increasing heavy vehicle traffic.

Gravel re-sheet to 200 mm compacted over a 9-10 m formation with a 7 m wide pavement. These works allow for verge mulching, drain reformation and cleaning, culvert extensions, correction of crossfall/camber, guide post and signage replacement/renewal.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.