• Funding program Roads to Recovery Program
  • Status In planning
  • Transport mode Road
  • Expected start/finish Sep 2025 - May 2026
  • Estimated project cost $60,000
  • Australian Government contribution $60,000
  • Local Council/Shire Shire of Waroona
  • State WA

Project description

Current Cul-de-sac turning circle doesn't have an adequate turning circle for the rubbish truck, which is resulting in kerb breakage and potholes forming within the road surface.

Reconstruct cul-de-sac to increase the turning circle and reinstate the kerbing to divert water flow to the stormwater drainage onsite. Cul-de-sac will be asphalted to prevent damage to road seal from the rubbish trucks.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.