• Funding program Roads to Recovery Program
  • Status Under construction
  • Transport mode Road
  • Expected start/finish Nov 2025 - Jan 2026
  • Estimated project cost $240,773
  • Australian Government contribution $240,773
  • Local Council/Shire City of Swan
  • State WA

Project description

This section between Great Northern Highway and Sayer Street is in need of renewal. It has a surface condition rating between 5 out of 5 based on the 2020 road condition survey. There is also evidence of subsidence following the drainage works completed along this street.

Profile off 30 mm asphalt wearing within 1 m width from the face of kerb, followed by an overlay of the entire section and apply 7 mm emulsion primer seal and lay 10 mm new Stone Mastic Asphalt wearing.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.