• Funding program Roads to Recovery Program
  • Status In planning
  • Transport mode Road
  • Expected start/finish Jan 2026 - Mar 2026
  • Estimated project cost $160,000
  • Australian Government contribution $160,000
  • Local Council/Shire Gilgandra Council
  • State NSW

Project description

The gravel road surface has deteriorated, with severe corrugation, multiple large potholes and loss of formation. Drainage is ineffective and requires reestablishment to prevent further damage and ensure safe access.

Reshape road and gravel sheet to a width of 6m wide X 130mm thick, compact to 100mm. Reestablish table and mitre drains, upgrade floodway’s and install erosion control measures where necessary.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.