• Funding program Roads to Recovery Program
  • Status In planning
  • Transport mode Road
  • Expected start/finish Nov 2025 - Feb 2026
  • Estimated project cost $36,200
  • Australian Government contribution $36,200
  • Local Council/Shire Shire of Boddington
  • State WA

Project description

The existing drainage culvert installed is showing sign of age and the concrete start to crumble. The culvert was installed in the late 1930 and is past its useful life and needs to be replaced before it collapses.

It is proposed to remove the existing culvert and replace it with a new structure and new headwalls. backfill the trenches and reinstate the seal on the section of road affected by the work. The work will happen under traffic control to ensure safety of all road users during the work.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.