• Funding program Roads to Recovery Program
  • Status In planning
  • Transport mode Road
  • Expected start/finish Mar 2026 - May 2026
  • Estimated project cost $23,150
  • Australian Government contribution $23,150
  • Local Council/Shire Shire of Boddington
  • State WA

Project description

These 3 sections of existing culverts are now past their useful life and are now in need of urgent replacement. Some sections are breaking down and missing head walls.

It is proposed to remove the old structures that are breaking down and replacing them with new pipe and new pre-cast concrete head walls. Backfill and reinstate the road pavement and open side road drain to ensure good drainage.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.