• Funding program Roads to Recovery Program
  • Status In planning
  • Transport mode Road
  • Expected start/finish Oct 2025 - Mar 2026
  • Estimated project cost $60,000
  • Australian Government contribution $60,000
  • Local Council/Shire Shire of Murrindindi
  • State VIC

Project description

Culvert has reached the end of its design life in terms of its condition and stream flow capacity. The asset exhibits significant deterioration, including joint failures, cracking, and localized deformation, which compromise its load-bearing capacity and long-term serviceability.

This includes the removal of failed 1200 RCP culvert, and replacement with recycled Box Culverts, in a two-cell 1200x900 RCBC arrangement, with rock beaching works at outlet.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.