• Funding program Roads to Recovery Program
  • Status Under construction
  • Transport mode Road
  • Expected start/finish Nov 2025 - Dec 2025
  • Estimated project cost $493,618
  • Australian Government contribution $493,618
  • Local Council/Shire City of Greater Geelong
  • State VIC

Project description

Old asphalt seal is showing signs of distress (ie. longitudinal and block cracking, extensive rutting and potholing). Length of works 500 metres (m)

Deep lift asphalt patch out in traffic running lanes and bus stop zones using 20mm type SI asphalt at 100mm thickness and overlay with 10mm type N wearing course Crumb Rubber Asphalt at 40mm thickness entire width of road from kerb line to kerb line

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.