• Funding program Roads to Recovery Program
  • Status Under construction
  • Transport mode Road
  • Expected start/finish Sep 2025 - Dec 2025
  • Estimated project cost $721,899
  • Australian Government contribution $721,899
  • Local Council/Shire Tablelands Regional Council
  • State QLD

Project description

The road has little to no gravel left, leaving the surface rough and uneven. This makes it difficult to drive on safely and requires new gravel to restore the road.

We propose to re-sheet a length of approximately 2.5km with varying widths between 6m and 5m of Gunnawarra Road with new gravel along the length and width of the above mentioned chainages. The works will include grading the surface, placing and compacting new gravel, and clearing drains where required to improve water flow.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.