• Funding program Roads to Recovery Program
  • Status In planning
  • Transport mode Road
  • Expected start/finish Apr 2026 - Jun 2026
  • Estimated project cost $325,596
  • Australian Government contribution $325,596
  • Local Council/Shire Tablelands Regional Council
  • State QLD

Project description

The gravel road continues to be washed out where the stormwater drain crosses the road. This results in increased reactive maintenance requirements and cost.

Construct a concrete floodway on the Forsyth Road (unsealed) where the storm water drain (also just gravel currently) crosses the road. Width to be 7m, length approximately 40m to be confirmed in design phase to ensure desired outcomes are achieved.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.