• Funding program Roads to Recovery Program
  • Status Under construction
  • Transport mode Road
  • Expected start/finish Oct 2025 - May 2026
  • Estimated project cost $260,000
  • Australian Government contribution $260,000
  • Local Council/Shire Katherine Town Council
  • State NT

Project description

Road surface severely degraded and suffering from: - Potholes, - Block cracking, - Longitudinal cracking at Providence Court intersection, - Significant surface deformation and cracking at the road sag which appears to provide overland flow conveyance to the open channel downstream, - Expedient patching throughout road extent, - Surface stripping adjacent to the kerb at multiple locations, and - Bitumen flushing at multiple locations.

Mill and replace with a two coat spray seal with strain alleviating membrane. The work will involve pavement reshaping and repairs.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.