• Funding program Roads to Recovery Program
  • Status In planning
  • Transport mode Road
  • Expected start/finish Jan 2026 - Jun 2026
  • Estimated project cost $855,400
  • Australian Government contribution $500,000
  • Local Council/Shire Brimbank City Council
  • State VIC

Project description

The existing road pavement exhibits oxidation and areas of significant cracking, loss of aggregate and longitudinal roughness. In addition significant lengths of concrete kerbing is in a poor condition.

The project includes the following major aspects - Rehabilitation of 498 metres of existing road pavement and resurfacing with asphalt, reconstruction of 1005 metres of existing kerb and channel, reconstruction of existing vehicle crossings where required, reconstruction of all damaged footpath, construction of 330 metres of underground drainage. This project will be jointly funded by R2R funding and the council's own capital works budget.

Total cost of proposed project is $855,400

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.