• Funding program Roads to Recovery Program
  • Status In planning
  • Transport mode Road
  • Expected start/finish Dec 2025 - May 2026
  • Estimated project cost $750,000
  • Australian Government contribution $200,000
  • Local Council/Shire Shire of Manjimup
  • State WA

Project description

Some sections of the road are failing with pot holes and and uneven running surface the result; some lengths of the seal are narrow resulting in edge breaks being common.

Replace culverts as identified in the engineering design. Import and place additional gravel to the shoulders then form the sub-grade to match the design alignment and levels. Import, spread, compact and shape new gravel to form a 9 metre wide pavement then place a 7 metre wide, 2 coat spray seal with centre and barrier lines. Place guide posts as required. Additional funding provided by: Regional Road Group $500,000 Shire of Manjimup $ 50,000

Total cost of proposed project is $750,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.