• Funding program Roads to Recovery Program
  • Status In planning
  • Transport mode Road
  • Expected start/finish Feb 2026 - May 2026
  • Estimated project cost $237,600
  • Australian Government contribution $237,600
  • Local Council/Shire Shire of Boyup Brook
  • State WA

Project description

Recent Assessments have indicated significant deterioration of the gravel materials, which has resulted in exceptionally low levels. This degradation is contributing to slippage on the road surface, creating a hazardous enviroment for traffic and heavy vehicles

Reshaping 3,300 metres long road surface that is 10 metres wide. The work will involve the application of 150 mm depth of gravel to enhance the roadway's structual integritty and safety.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.