• Funding program Roads to Recovery Program
  • Status In planning
  • Transport mode Road
  • Expected start/finish Jan 2026 - Apr 2026
  • Estimated project cost $124,540
  • Australian Government contribution $100,000
  • Local Council/Shire Regional Council of Goyder
  • State SA

Project description

Bower Boundary Road is an Unsealed Category 3a road providing access for primary producers in the Bundey area south from the sealed Goyder Highway area to the sealed Thiele Highway area and south to the Murray Bridge processing area. The existing road surface has reached the end of its life and requires renewal.

Reforming of existing road surface, importing and spreading road base. Re-shaping and cleaning of drains and culverts and reformation of the intersections to accommodate turning movements of 26 metre vehicles. The road specification is to be 8.5 m wide, 100 mm pavement thickness and 4-6% cross fall. Additional funding of $24,540 required to fund the total project to be provided from Council sourced rate revenue.

Total cost of proposed project is $124,540

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.