• Funding program Roads to Recovery Program
  • Status Under construction
  • Transport mode Road
  • Expected start/finish Nov 2025 - Jun 2026
  • Estimated project cost $112,500
  • Australian Government contribution $112,500
  • Local Council/Shire Shire of Plantagenet
  • State WA

Project description

There are failing sections of the asphalt with considerable cracking in several locations. The patches are escalating in severity over time. Repairs are required and a reseal necessary to retain the integrity of the road.

Drainage subsidence repairs to be carried out at SLK 0.565 to 0.575 south bound, SLK 0.668 to 0.673 north bound, SLK 0.835 to 0.840 south bound, SLK0.88 to 0.91 south bound, SLK 1.00 to 1.01 north bound, SLK 1.20 to 1.21 north bound and SLK 1.26 to 1.29 north bound. Box out and upgrade pavement. Reseal SLK 0.565 to 1.29 with Asphalt.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.