• Funding program Roads to Recovery Program
  • Status In planning
  • Transport mode Road
  • Expected start/finish Jan 2026 - Jun 2026
  • Estimated project cost $900,000
  • Australian Government contribution $900,000
  • Local Council/Shire Townsville City Council
  • State QLD

Project description

The existing asphalt surface has reached end of life - it is displaying significant cracking, potholing, and surface unevenness. The kerb and channel is in very poor condition with multiple defects throughout the entire length. The existing pathway is also displaying defects.

Replace the existing road surface, including kerb and channel and pathway renewal on both sides.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.