• Funding program Roads to Recovery Program
  • Status Not started
  • Transport mode Road
  • Expected start/finish Jan 2026 - Apr 2026
  • Estimated project cost $335,268
  • Australian Government contribution $270,000
  • State VIC

Project description

Asphalt Roadway Renewal. Defects include wide ranging cracking (longitudinal, transverse), depressions in the carriageway including rutting along wheel paths, and pavement failing in sections. Scope of works, profile: 50 mm with 100mm deep lift on the South Side, resurface: full width with 50 mm size 10mm aggregate wearing course and 50mm size 14mm aggregate base course in deep lift sections with Greenpave U dense-graded Hot Mix Asphalt, including Green coloured surface treatment within the bicycle lane at the roundabout. City of Melbourne Project Reference WKO1229102.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.