• Funding program Roads to Recovery Program
  • Status Not started
  • Transport mode Road
  • Expected start/finish Mar 2026 - Jun 2027
  • Estimated project cost $350,000
  • Australian Government contribution $350,000
  • State NT

Project description

Resealing works on Kalkarindji Airport access road from Chainage 0+000 to 1+200 (approximately) using S10E bituminous binder to address existing pavement deterioration and seal failure within the carriageway. The scope includes construction of a drain inlet at approximately Chainage 0+070 to improve surface drainage, reinstate of table drain, as well as installation of new road signage by removal of damaged & outdated signage. These works aim to restore the road surface to an acceptable level of services, improve road safety and support the long-term sustainability of the asset.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.