• Funding program Roads to Recovery Program
  • Status Not started
  • Transport mode Road
  • Expected start/finish May 2026 - Dec 2026
  • Estimated project cost $180,855
  • Australian Government contribution $180,855
  • State NT

Project description

Major road repair on section of Pickertaramoor Road road just before Pirlangimpi Road Intersection approximately 100 metres which continues to wash away every wet season due to the water flow. Rectification works include 1. Water redirection with the shaping of new deeper drains, cutting in new swale drains. 2. Raising the road levels, excavation of soft subgrade, importing of approximately 200tons of 100 mm rock from Darwin and freight, including fines for compaction, gabion mattresses to place and fill, GEO Fabric and 3. Installation of culverts 1 of X 4lm x 4lm and concrete bridge. 3. Includes wet hire of 9 tonne loader, 14 tonne Excavator, Skid steer, Tipper Truck. Roller and Water Truck.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.