Installation of traffic signals (filter turns allowed)
Modify northbound approach to roundabout (Kern Brothers Dr) with multiple curve entry treatment and modify central island. Install enhanced advance warning signing and roundabout giveway signs. Provide bikeway treatment at roundabout. Remove a tree
Modify approach nodes and centre island geometry to improve safety and flow. Resurface and linemark
Modify western leg of roundabout (Fulham Road) by installing traffic islands. Advance the give way lane on Cambridge Street. Install enhanced roundabout giveway signs. Paint an outline marking supplement with RRPMs around the central island
Installation of enhanced roundabout give way signs. Provision of bikeway treatment at the roundabout
Install fully controlled signal for right turn movements during peak hours. Additional arrow for right turn movements during off-peak hours. Upgrade the existing high-speed left turn from Mortenson Road to Hinkler Road
Improve traffic signal phasing. Extend the existing right turn auxiliary lanes to reduce vehicle queueing in the through lane and improve sight lines. Upgrade existing auxiliary queue storage in response to revised phasing during peak periods
Define turning paths at intersection and install kerb build-out on Poinsettia Ave. Install central median on Bayview St. Provide green painted bicycle lanes. Bring forward give way lane closer to Bayview St. Reduce Bayview St parking obstructions
Removal of roadside hazards. Chevron Alignment Markers with existing advisory speed signs and Raised Reflective Pavement Markers. Superelevation upgrade. Installation of guardrail
Install new warning signs and modify existing flashing warning signage. Separate left turn deceleration lane, painted or channelised. Install a high friction surface. Remove hazards. Improve southbound zebra crossing. Reduce speed limit