Improve pavement, install centre line, improve signage and guide posts
Realign intersection into S bend to define Jutland Rd is the through route and improve drainage
Install curve warning signs, prune vegetation, improve vertical curves and improve drainage
Modify intersection geometry, upgrade/realign drainage, relocate signs, upgrade railing and safety barriers at drains, modify/relocate pedestrian crossing, install pram ramp and relocate non-frangible poles outside of clear zone
Reconstruct S bend on Grass Patch Rd and increase the staggered intersection distance for the Swan Lagoon Rd through movement, install associated signage and drainage and seal the Swan Lagoon Rd approach of the intersection
Modify horizontal floodway width and alignment, clear vegetation, remove rock spoil from within clear zone and upgrade signage
Install four-way roundabout and modify turning lanes, right turn movements, pedestrian facilities and commercial accesses
Minor geometry improvements, upgrade intersection signs and markings, remove roadside hazards from the clear zone and improve road surface
Modify intersection geometry, removal hazardous objects, install pedestrian crossing refuge and pedestrian path including connection to existing paths, install new and correct existing pram ramps, reinstall tactile paving and upgrade pavement marking
Channelise intersection, install median island on Tip Rd, extend 60 km/h speed zone to west side of Tip Rd, extend culvert end to beyond clear zone, remove vegetation from clear zone and upgrade pavement markings, RRPMs and signage