Excessive crackingMill asphalt road pavement 100mm deep. Pave AC14 Class 450 100 mm deep
Excessive crackingMill asphalt road pavement 100mm deep. Pave AC14 Class 450 100 mm deep
Excessive cracking and roughnessMill asphalt road pavement 100mm deep. Pave AC14 Class 450 100 mm deep
Excessive crackingMill asphalt road pavement 100mm deep. Pave AC14 Class 450 100 mm deep
Excessive crackingMill asphalt road pavement 100mm deep. Pave AC14 Class 450 100 mm deep
Excessive crackingMill asphalt road pavement 50mm deep. Pave AC14 Class 450 50 mm deep
Excessive crackingMill asphalt road pavement 50mm deep. Pave AC14 Class 450 50 mm deep
Lack of gravel, surface rutting, poor shape and inadequate drainage.It is proposed to rectify the problems with this section of road by installing additional mitre drains and cleaning the existing drains. The road will then be tyned and re-shaped. Following this new gravel will be imported, spread and compacted. The road will then be trimmed to its final shape.
Excessive crackingMill asphalt road pavement 150mm deep. Pave 100 mm AC20 Class 450 and then pave 50 mm AC14 Class 450.Total cost of proposed project is $381,556
Excessive cracking and potholesIn the traffic lanes, mill 100mm asphalt. Pave 50mm AC14 Class 450 (HDA) (base) then pave 50 mm AC14 Class A15E.
In the parking lanes, mill 50 mm. Pave 50 mm AC14 Class 450