Section of road contains insufficient pavement and requires constant maintenance worksResheet unsealed road with 100mm Class 3 crushed rock, form drains and perform localised drainage works to improve road condition in this section.
Road pavement is cracked and broken about 75%.It is proposed to excavate and remove old pavement. Resurface with asphalt concrete pavement.Total cost of proposed project is $47,391
Section of road contains insufficient pavement and requires constant maintenance worksResheet unsealed road with 100mm Class 3 crushed rock, form drains and perform localised drainage works to improve road condition in this section.
Section of road contains insufficient pavement and requires constant maintenance worksResheet unsealed road with 100mm Class 3 crushed rock, form drains and perform localised drainage works to improve road condition in this section.
Road pavement is rutted about 90%It is proposed to excavate and remove old pavement layer and re-sheet with asphalt concrete.Total cost of proposed project is $59,827
Unsealed road shoulder on south side becomes a hazard during wet periods.Additional and replacement of kerb and gutter then reconstruct south shoulder and then seal. 320 metres long by 7 metres in width
Road pavement is cracked and damaged about 70%.It is proposed to excavate and remove old pavement and resurface with asphalt concrete.Total cost of proposed project is $53,446
Road pavement is 70% rutted and damaged.It is proposed to reconstruct the pavement by removing the old pavement and resurfacing with asphalt concrete.Total cost of proposed project is $41,000
Current road surface has been eroded resulting in limited rubble remaining on surface. The current road is unformed, boggy and slippery when wet with bulldust depressions during summer.Rip and reform, cart rubble materials to reform the road surface and increase traffic safety during wet and dry conditions
Extensive pavement failures within the area, and requires constant maintenance worksPulverise,stabilise, shape, relay and compact existing pavement/subgrade. Apply 100mm thick layer of fine crushed rock. Apply two coat spray seal. Clean and reshape existing drain