Major congestion occurs during PM peak hours. Extra southbound lane through roundabout will assist traffic hour.Adding extra southbound lane North and South of roundabout.Total cost of proposed project is $572,566
The existing surface is stripped, cracked and potholed.10mm aggregate reseal
Eva Lynch Way has a long straight length of road (500m) with no traffic calming devices resulting in excessive speeds.Traffic calming devices.Total cost of proposed project is $166,955
Rand Avenue is a long straight road with no traffic calming measures resulting in excessive speeds through the intersection which results in increasing vehicular and pedestrian conflicts.Installation Of RoundaboutTotal cost of proposed project is $199,066
Existing pavement and seal is worn out and has extensive cracking and deformation.Final sealTotal cost of proposed project is $65,581
Traffic Volumes in this location have reached a point where this road now requires extra lanes.Turning single carriageway road into dual carriageway road (4 lanes).Total cost of proposed project is $1,123,056
The surface is stripped and cracked.The road will be resealed with 10mm aggregate and the cul-de-sac will be overlayed with a 25mm thick asphalt.