• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jul 2012 - Mar 2014
  • Estimated project cost $881,052
  • Australian Government contribution $573,534
  • Local Council/Shire Yarra Ranges Council
  • State VIC

Project description

The existing road has a crushed rock formation requiring ongoing maintenance, with residents experience problems associated with dust, corrugations and potholes. An overall reduction in maintenance costs is expected. Construction of the existing unmade road will improve the amenity and quality of access for these properties.

Construct 1600 metres of unmade road to rural spray seal standard typical 4.5 metres width pavement, and 150 metres of road widening. Drainage improvement works include culverts installation as required. Intersection improvements at Victoria Road and Maurice Road. Maintenance

Total cost of proposed project is $881,052

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.