• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2014 - May 2015
  • Estimated project cost $180,000
  • Australian Government contribution $88,000
  • Local Council/Shire Shire of Waroona
  • State WA

Project description

The subject section of McClure Road is well past the end of its serviceable life. The road structure has severely deteriorated under modern traffic loads. Additionally, the seal width of 3.6 metres is inadequate for the traffic the road carries. Longitudinal drainage is also inadequate and since the area is low lying and wet this has further contributed to the road's failure.

Widening and lifting of the road pavement to accommodate a wider seal and to lift the road structure out of the wet subgrade conditions. Improvements to longitudinal drainage to ensure the new road pavement can remain dry. Importation of new pavement material and application of a hot bitumen seal to a minimum width of 6.2 metres.

Total cost of proposed project is $180,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.