• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Feb 2017 - May 2017
  • Estimated project cost $286,575
  • Australian Government contribution $247,785
  • State NSW

Project description

The road surface is affected by cracks, potholes and deformations. Some sections of kerb and gutters have been displaced. There is water ingress into road pavement from higher ground causing pavement failures.

The proposed work includes installation of subsoil drainage system, replacement of damaged sections of kerb and gutters and reconstruction of road pavement. Length = 140 m; Width = 6.6 m; Area = 924 m2.

Total cost of proposed project is $286,575

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.