• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish May 2016 - Sep 2016
  • Estimated project cost $100,206
  • Australian Government contribution $100,206
  • Local Council/Shire Campaspe Shire Council
  • State VIC

Project description

Components of the bridge have been listed as failed or are failing under the adopted service level, being a missing timber pile, north east wing wall to be made sound and the timber wing wall panel to be replaced. The bridge crosses a natural water course and has a total span of 16.8m in length by 5.2m width.

To reinstate the bridge components, replace the missing pile to prolong the life of the structure. Install delineation markers to enable clear sightlines to road users for all weather conditions.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.