• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish May 2017 - Nov 2017
  • Estimated project cost $433,000
  • Australian Government contribution $350,000
  • Local Council/Shire Tweed Shire Council
  • State NSW

Project description

The existing road pavement is in poor condition with numerous surface defects, cracking and pavement failures. A lack of drainage around the road perimeter and cracked surfaces is allowing ingress of moisture and accelerated deterioration.

Rehabilitation through the excavation and removal of existing pavement and the application of a new sealed asphalt surface. Construct concrete barrier kerb and channel to both sides of road and a new stormwater drainage system throughout.

Total cost of proposed project is $433,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.