• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jun 2022 - Jun 2024
  • Estimated project cost $700,083
  • Australian Government contribution $25,000
  • Local Council/Shire Barcoo Shire Council
  • State QLD

Project description

The existing unsealed gravel pavement at this location is prone to damage and scouring during rainfall events and can result in loss of access. This impacts on access to nearby properties that rely on this road. The existing concrete culverts at this location are also in poor condition and require replacement.

Construction of a reinforced concrete floodway for the full length identified and replacement of the existing culvert structure to improve the resilience of this asset.

Total cost of proposed project is $700,083

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.