• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2024 - May 2024
  • Estimated project cost $373,779
  • Australian Government contribution $300,000
  • State NSW

Project description

The Asphalt Road surface is cracked and failed in many places with rutting and potholes on the road surface indicating poor pavement defects.

Proposes to heavy patch damaged areas up to 150mm in depth to repair the road pavement failure and resurface (mill and fill) with a 50mm thick asphalt concrete overlay. Approximate area to be rehabilitated is 5933 square metres with dimensions 495m long x12m wide.AC14 C450 50mm plus AC20 C320 50mm patching included

Total cost of proposed project is $373,779

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.