• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2023 - Jun 2024
  • Estimated project cost $1,796,000
  • Australian Government contribution $899,000
  • Local Council/Shire South Australian Local Government Grants Commission
  • State SA

Project description

The road pavement has insufficient thickness. There is a rutting – pavement interactive. The road requires full pavement reconstruction due to its narrow width, heavy vehicle loading, failed pavement and seal, poor road, and shoulder drainage. The road is in an 80km hour zone and has a large amount of intersection between heavy vehicles and commuter vehicles with the widening of the road and shoulders improving safety.

The work proposed includes widening and reconstructing the whole section of Magazine Road with a pavement that is suitable for long term (future projections with growth) heavy vehicle loading of adequate width and shoulders/clear zones. The road surface suffers from heavy rutting and poor drainage. All road requires full reconstruction. The overall carriageway width will be increased from 6m to 8.6m with pavement to be surfaced to a thicker from 300mm to 335mm.

Total cost of proposed project is $1,796,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.